欧美成人影院亚洲综合图,亚洲午夜福利精品无码不卡,国产成人精品日本亚洲,午夜小视频在线,国产视频 第一页,中文字幕丝袜一区二区,男女性午夜福利网站,丰满人妻久久中文字幕

400-6388-667Food/Pharmaceutical/Cosmetic/Mechanical domain experts

homeother product details

Stainless steel gas stove pot large cooker wok gas food mixing pot

Release date:[2017-03-11]     Click rate:

main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.


overview
parameter

Gas sandwich pot with a large heating area, high thermal efficiency, heating evenly, material boiling time is short, easy to control the heating temperature and so on.


main feature:

1, full combustion, smoke-free dust, a small amount of carbon deposition, no environmental pollution.

2, the flame temperature free to adjust the temperature up to 300 ℃ or so.

3, the structure is reasonable, easy to use.

4, strong energy, fire and fire, thermal efficiency than similar products increased by 25%.

5, fuel: liquefied petroleum gas, pipeline gas, natural gas, the use of oil is strictly prohibited.

6, air consumption: than similar products by about 20%.

skills:

1, remove the heater, put the gas fire cover.

2, open the valve and intake interface.

3, counterclockwise to open the valve, open fire lit. (With a fire stove please ignite the fire).

4, while adjusting the throttle and valve switch, until the required flame.

5, stop working, close the angle valve and valve.

Precautions:

1, regularly check the sealing of the joints.

2, regularly check the stove, forbidden dirt to plug the stove plug.

3, when the first tilt when the steam, after the speed control switch.

maintenance:

1, into the steam pipe and outlet pipe leakage, elected tight nuts do not solve the problem, you should add or replace the filler.

2, the pressure gauge and safety valve should be regularly checked, if the failure of timely replacement and repair.

3, the gear box to start using after 50 hours, should be removed to let go of lubricants, rinse with kerosene or diesel, add 30 # - 40 # clean oil, use 150 hours after the second oil change, after the specific circumstances , Each used to 1000 hours or so oil change once.

4, anti-rust oil peeling, should be timely brushing, painted outside the pot of paint, it is recommended to use X55-3 aluminum powder water resistant paint.

5, the pot used after 5 years, the proposed safety of water pressure test, after the interval of water pressure test, according to the requirements of technical departments around. Water pressure test pressure P water according to the following circumstances: When the rated working pressure P <0.6MPa, P water = 0.15MPa; when the rated working pressure P = 0.6-0.8MPa, P water = P + 0.3MPa

6, the pot outside the pot body using 4.0 ~ 5.5 mm thick steel plate manufacturing, steel A3, when the outer pot after years of corrosion reduced to 2mm below, should stop using. 7, the pot of stainless steel welding and other stainless steel welding joints, should be used stainless steel electrode 102, Austrian 107, Austria 132, Austria 137, should not use other grades.

Use Note:

1, should use liquefied petroleum gas, pipeline gas, natural gas and other fuels, prohibited the use of oil;

2, connected to the stove hose and the furnace end and the valve end to be tightened, and should be naturally under the stove surface sagging, and maintain the distance of 10 cm or more, so as not to be fire scorched, resulting in an accident;

3, do not install the gas heating sandwich pot in the room, and then use the coal stove, liquefied petroleum gas or other stoves;

4, gas heating around the sandwich pan do not stack flammable items;

5, with the gas field must ensure that spacious and well ventilated;

6, gas heating sandwich pan when the ignition gas to be someone to take care of;

7, people go to turn off;

8, found that leakage or abnormalities to quickly close the valve to open the doors and windows ventilation;

9, before the break to check the gas valve and the front of the switch is closed.

Installation procedures:

1, tighten the bracket of the two set screws, shake the pot body, both ends of the inlet pipe and outlet pipe is not allowed to rotate with the pot.

2, the installation is completed, the mixing-type sandwich pot, should be empty test run test, until the transmission parts of the normal operation before they can be put into use.

3, after the air, such as joints at the leak, you can tighten the nut until the leak so far.


Contact us

Learn more about our detailed information, please contact
400-6388-667

Or leave a message to us

主站蜘蛛池模板: 亚洲伦理一区二区| 久青草免费在线视频| a级毛片免费网站| 免费高清a毛片| 国产一区二区免费播放| 欧美三级自拍| 免费一级毛片在线播放傲雪网| 米奇精品一区二区三区| 国产乱码精品一区二区三区中文 | 黄色在线网| 热99精品视频| 喷潮白浆直流在线播放| 亚洲综合经典在线一区二区| 成年网址网站在线观看| 亚洲人成色77777在线观看| 大乳丰满人妻中文字幕日本| 黄色一级视频欧美| 91精品国产综合久久香蕉922 | 精品一區二區久久久久久久網站| 中文字幕在线观看日本| 在线日韩日本国产亚洲| 91在线无码精品秘九色APP| 99re热精品视频国产免费| 久久99国产视频| 无码精品国产VA在线观看DVD| 一级毛片基地| 亚洲综合日韩精品| 国产高清精品在线91| 丝袜高跟美脚国产1区| 日本免费一区视频| 亚洲资源站av无码网址| 久久精品国产一区二区小说| 亚洲国产日韩视频观看| 女高中生自慰污污网站| 国产第一页第二页| 永久免费av网站可以直接看的| 国产69囗曝护士吞精在线视频| 亚洲二区视频| 欧美日韩一区二区三区在线视频| 免费欧美一级| 国产精品制服| 黄片在线永久| 亚洲欧美日韩色图| 亚洲一级毛片| 亚洲成人在线网| 制服丝袜亚洲| 日韩福利在线观看| 手机在线看片不卡中文字幕| 视频一本大道香蕉久在线播放| 国产精品美乳| 毛片三级在线观看| 免费三A级毛片视频| 992tv国产人成在线观看| 色网站在线视频| 亚洲国产精品VA在线看黑人| 国产青青操| 无码AV动漫| 国产性精品| 欧美国产综合色视频| 91青青在线视频| 午夜无码一区二区三区在线app| 国产精品极品美女自在线网站| 亚洲精品第五页| 亚洲欧美日韩中文字幕一区二区三区| 免费不卡视频| 理论片一区| 综合色婷婷| 91口爆吞精国产对白第三集| 人妻精品久久久无码区色视| 99re在线观看视频| 日韩av电影一区二区三区四区| 美女国产在线| 国产人人干| 97超爽成人免费视频在线播放| 亚洲高清无码久久久| 精品视频在线观看你懂的一区| 国产微拍精品| 国产97视频在线观看| 亚洲黄色片免费看| 四虎精品国产AV二区| 日本国产在线| 狠狠色婷婷丁香综合久久韩国|